Program Documents

Widening Program Presentation (6.57 Mb pdf)
FWIP Viewing Info (8.15k pdf)



PUBLIC HEARING DOCUMENTS – from hearings held in September 2007:

Public Hearing Notice (92k pdf)
Presentation (8.6 Mb pdf)
Program Brochure (851k pdf)
Public Hearing Comments and Responses (17.7MB pdf)




NO NET LOSS REFORESTATION DOCUMENTS – Public Forum held December 13, 2010:
Download NJTA No Net Loss Reforestation Application Oct 2010 (406kb pdf)
No Net Loss Reforestation APPENDIX A (1.81MB - PDF)
No Net Loss Reforestation APPENDIX B (14.25MB - PDF)
No Net Loss Reforestation APPENDIX C (64KB - PDF)
No Net Loss Reforestation APPENDIX D (11.28MB - PDF)
No Net Loss Reforestation APPENDIX E (1.78MB - PDF)
No Net Loss Reforestation APPENDIX F (20.59MB - PDF)



ENVIRONMENTAL IMPACT STATEMENT (EIS)

An Environmental Impact Statement (EIS) documents the possible impacts a major project like the Interchange 6 to 9 Widening Program will have on various aspects of both the natural and built environments and examines all aspects of the environment including, wetlands, noise, air pollution and impacts to both public land and private property.


The Executive Order 215 (EO-215) EIS prepared for the Interchange 6 to 9 Widening Program has been reviewed and conditionally approved by the New Jersey Department of Environmental Protection (NJDEP) pending receipt of land use regulatory permits.


Table of Contents (146k pdf)
Chapter 1 (2.5 Mb pdf)
Chapter 2 (1.2 Mb pdf)
Chapter 3: pp 1 – 102 (2.5 Mb pdf)
Chapter 3: pp 103-172 (5.3 Mb pdf)
Chapter 3: pp 173-240 (4.7 Mb pdf)
Chapter 3: pp 241-343 (3.7 Mb pdf)
Chapter 3: pp 344-464 (5.5 Mb pdf)
Chapter 4 (4.9 Mb pdf)
Chapter 5 (276k pdf)
Chapter 6 (129k pdf)
Chapter 7 (123k pdf)
Chapter 8 (103k pdf)


Volume 2: Appendices – Cover Pages (66k pdf)
Appendix A – Soil Types and Erodibility Factors (193k pdf)
Appendix B – Correspondence (377k pdf)
Appendix C – Right-of-Way Impacts, April 2006 (77k pdf)
Appendix D – Traffic Data (6.2 Mb pdf)
Appendix E – NJ Turnpike CAL3QHC Input/Output Materials (1.1 Mb pdf)
Appendix F – Preliminary Noise Barrier Analysis (231k pdf)




NJ Department of Environmental Protection Letter of Interpretation (LOI) – the jurisdictional boundaries of freshwater wetlands and waters within the 6 to 9 Widening Program and the Wetland Delineation Plan sheets.

LOI Letter from NJ DEP 3-8-2007 (441 KB pdf)

Wetland Delineation Plan Sheets 1 to 27 (4.17 MB pdf)

Wetland Delineation Plan Sheets 28 to 54 (3.81 MB pdf)